Decision on permit - Västerbotten County Administrative Board

posted in: Savar | 0

Decisions on permits for the construction and operation of wind turbines at Ivarsboda / Gryssjön within the municipalities of Umeå and Robertsfors were announced on 2014 April 04 (VindIn project Sävar). (Case designation 10-551-1182, archive designation 2012-2409-51) - Download the decision here: VindIn AB_Authorities for wind power Ivarsboda-Gryssjön. Appendix to the project area: Appendix 1 LST decision 140410

The decision was appealed by three parties: VindIn AB, Närboende i Gryssjön and Västerbottens Ornitologiska Förening. An opinion from the County Administrative Board of Västerbotten regarding the appeal came on 2014/09/05. Opinion can be downloaded here: Purchase 18 opinion Lst